Hartley Home Farm
Farm inspection report - Hartley Home Farm
a fictional 480-acre cash-rented corn and soybean farm in north-central Illinois, owned by a family trust
Visit details
- Landowner
- Hartley Family Trust (trustee: Ann Hartley)
- Farm and tracts
- Home Farm, LaSalle County; FSA farm 1204, tracts 88 and 91
- Tenant and lease
- Mason Ag LLC (Rick Mason), cash rent, year 3 of 5
- Date and inspector
- October 9, 8:30 to 11:15, L. Ortega
- Present
- Rick Mason for the buildings; fields alone
At a glance
Harvest is half done and yields look average. The east waterway is washing out at its head and needs repair before spring. The machine shed roof leaks over the back bay.
Approve the waterway repair (one quote received, second asked for). Decide whether to reroof the machine shed or patch it this year.
Field 1 (160 ac): soybeans, harvested. Field 2 (150 ac): corn, standing, good stalks. Field 3 (140 ac): corn, harvested, good residue cover.
Fall tillage not started. Tenant to send the lime receipts for Field 3.
East waterway washing out at its head, about 40 ft, 2 ft deep. Rills on the Field 3 slope.
Two tile outlets on the creek flowing, one guard missing. One blowout over the main in Field 2, flagged.
Machine shed: roof leaks over the back bay, two sheets loose. Barn: sound.
Send lime receipts by October 31. Remove chemical jugs by November 15. Fix the west gate.
Second quote for the waterway. Tile contractor for the blowout and the outlet guard.
Sign-off
L. Ortega, October 9
Observations
Overall condition
Fair
Summary
Harvest is half done and yields look average. The east waterway is washing out at its head and needs repair before spring. The machine shed roof leaks over the back bay.
Decisions the owner needs to make
Approve the waterway repair (one quote received, second asked for). Decide whether to reroof the machine shed or patch it this year.
Crop and condition by field
Field 1 (160 ac): soybeans, harvested. Field 2 (150 ac): corn, standing, good stalks. Field 3 (140 ac): corn, harvested, good residue cover.
Weeds and stand
Waterhemp patches on the north edge of Field 1
Lease practices checked
Lime and fertility as the lease requires, Residue left as the lease requires, No encroachment on edges
Lease notes
Fall tillage not started. Tenant to send the lime receipts for Field 3.
Erosion
East waterway washing out at its head, about 40 ft, 2 ft deep. Rills on the Field 3 slope.
Waterways, terraces and tile
Two tile outlets on the creek flowing, one guard missing. One blowout over the main in Field 2, flagged.
Program documents reviewed
Current plan identified, Observations recorded
Photo points
Points 1 to 6 retaken; point 4 shows the waterway head
Buildings
Machine shed: roof leaks over the back bay, two sheets loose. Barn: sound.
Grain bins
Two bins, both empty and swept; fan on bin 2 runs
Wells, fences and drives
Old dug well by the barn is capped; west gate hinge broken
Hazards
Empty chemical jugs stacked in the machine shed
Tenant tasks
Send lime receipts by October 31. Remove chemical jugs by November 15. Fix the west gate.
Manager follow-up
Second quote for the waterway. Tile contractor for the blowout and the outlet guard.
Next inspection
Early April, before planting